OVERVIEW

CANADA NEEDS 3.5M NEW HOMES BY 2030

Massive Canada meets demand for housing and green buildings:

Quality

We uphold exacting standards in our engineered wood production, providing friction-fit connections that outperform concrete and on-site wood framing.

Durability

Our manufacturing process produces high-performance insulated wall panels that are fireproof, waterproof and seven times more impact-resistant than drywall.

Flexibility

Our automated 3D assembly line is versatile, capable of building everything from laneway homes and townhomes to hotel rooms and multi-family apartment pods.

Rapidity

We’re addressing the housing market’s demand with our efficient manufacturing process, which is significantly faster than traditional on-site construction.

Less Waste

Precision cutting in a controlled environment optimizes our production and allows for automated separation of waste and cost-effective on-site re-use, re-purposing, and recycling.

Economy of Materials by Design

We’re committed to using resources responsibly. We continuously rethink and test ways to use less wood while still achieving the same structural performance.

High Technology Jobs

We’re at the forefront of the industry, using AI in our design and the latest CAD-CNC technology machines. We recruit top knowledge workers.

Circular Economy

We embed Circular economy principles in our research, design, procurement and manufacturing process. Our buildings can be disassembled, relocated, refurbished and re-used.

Displacing Carbon-Intensive Materials

We’re addressing the housing market’s demand with our efficient manufacturing process, which is significantly faster than traditional on-site construction.

Massive Canada is in the right places to meet demand for housing:

Research Facility & Future Massive Plant

Our existing 29-acre industrial site is perfectly located, with 1,200 ft of railway siding along CN’s trans-Canada freight line and ideal for manufacturing and shipping large volumes of engineered wood.

Head Office &
Administration

We’re setting new standards in using AI design tools to create CAD drawings that drive CNC cutting and assembly line equipment. Automation is critical to meet ever-growing market demand.

massive head office

91,000 sf plant #1 &
Future megaplant #3

Our 178-acre industrial site is 7 minutes from the airport in a great community. It is an ideal site for the 500,000 sf manufacturing plant that will allow us to deliver 20,000 homes per year in 2027.

ARCHITECTS | BUILDERS | DEVELOPERS

CONTACT US

Please fill out the form below to find out more about Massive and get a quote or professional advice for your next mass timber project.

    INVESTORS

    CONTACT US

    Please fill out the form below to find out more about Massive
    Canada’s Confidential Investment Summary.